Volume plus cement, sand and gravel.
How it works
1:2:3 by volume, ~350 kg cement per m³. Add 10% waste.
Worked example with the defaults
This example is calculated from the page defaults. Change the form to update the live result.
| Length | 5 m |
|---|---|
| Width | 3 m |
| Thickness | 10 cm |
| Calculated result | 1.65 m³ · incl. 10% waste |
| Cement | 578 kg |
| Sand | 0.66 m³ |
| Gravel | 0.99 m³ |
Mix is a rough material estimate
The estimate adds 10% to the slab volume, then applies simplified cement, sand and gravel factors.
Limits and assumptions
- The 1:2:3 ratio and cement-per-volume factor are rules of thumb, not a structural mix design.
- Rebar, formwork, subgrade, moisture, aggregate grading and site-specific waste are excluded.
- Do not use this rough quantity estimate to specify load-bearing work.
Common questions
Can I order by the displayed volume ratio alone?
Material density and moisture vary; the page is a rough quantity estimate.
Can this specify structural concrete?
No. Structural strength and site conditions need a qualified mix design.